3-5 Day Rush

CPP-4418

Large Ridge Metallic Cable Set

PRICING -

Quantity10025050075010002500
7-12 Days5.094.994.894.794.694.596C
3-5 Days5.395.295.195.094.995C
Note :Price includes 1 location imprint
Freight Estimator

Description

  • Large Ridge Techie Pouch (CPP-4193) with zipper
  • Metallic 3-in-1 Charging Cable (CPP-4218) multiple USB adaptor
  • Heat Transfer, Embroidery and imprint on additional items available, see Terms and Conditions

 

Product Charges

Set Up Charge : 1 location all products:$50(g) 2nd location all products: $50.00(g)
Additional Pricing: : Run Charges each additional location unless otherwise stated- $0.45(g)

Product Details

Sizes : 7 L x 4 H
Imprint Area : 3 L x 1.25 H
Imprint Methods : Screen Printing
Production Time : 7-12 Working Days
Origins : China
Product Options : Less than catalog minimum quantities are available on most items. ($75g Charge per item.) Absolute minimum is 50% of catalog minimum; Call for more Details

Shipping Details

Carton Weight (Lbs) : 28
Units Per Carton : 250
Carton Length : 19
Carton Width : 15
Carton Height : 10

ORDER NOW

RELATED PRODUCTS